Unexpected Cost Added to Green Bridge Project Posted by scottsuhr on August 16, 2016 in Cedar Valley News An unexpected cost to the 3rd Street Bridge project has resulted from the geotechnical report. However, a contingency amount figured in the final cost should cover the amount. City Engineer Mike Cherry talks about the results of the report.